High G shaker VS vertical cutting dryer

High G shaker and vertical cutting dryer is the most improtant equipment for drilling cuttings waste management. Do you know how to match it suitablely?

Difference of High G shaker and vertical cutting dryer

High G shaker is a kind of vibrating equipment. With big G force to separate particals from cuttings and to dry the cuttings. But tt is mainly used for water based mud, cannot be used for oil based mud.

Vercial cutting dryer is a kind of centrifuge. Its main function to reduce the oil content on cuttings. GN vertical cutting dryer model GNCD930 can reduce OOC to 5% around.

World Largest Oil Show Top 3 List in 2013

  • World Largest Oil Show Top 1

cippe Zhenwei Petroleum Show The Annual World Petroleum Equipment Congress

China International Petroleum & Petrochemical Technology and Equipment Exhibition (cippe Oil Show), a regular gathering in petroleum and petrochemical industry, is held two sessions every year, March in Beijing and August in Shanghai.

General Information
Show name :The 13th China International Petroleum & Petrochemical Technology and Equipment Exhibition

Show time   March 19 – 21, 2013

Beijing Zhenwei Exhibition Co.,Ltd

The exhibitor for the Top 1 Oil Show registration work will soon start. More than 1,500 exhibitors have taken part in the cippe 2012 and more than 50,000 professional visitors participated in the cippe 2012 from 60 countries and regions around the world.

  • World Largest Oil Show Top 2

OTC 2013 Hold in Houston which is the second largest oil show in the World.

ADIPEC, Established as the largest conference program in the Middle East, ADIPEC attracted 235 leading regional and International speakers in 2012.  As the premier speaking platform in the region, which attracted 4,200 delegates in 2012, be a part of the 2013 program addressing the key Gas and Oil topics under the theme Energy for All in a Changing World’

Disposal water based drilling Cutting

To reduce the water based drilling cutting, Normally,the drilling company or the waste management company will use a High Cutting Dryer to dry the

cuttings to make it easier for tranportation, later on take the drilling cuttings for further treatment and diposal the cutting and handling the fluids with a polishing decanter centrifuge.

Learn more about this topic here:

200GPM Trailer mounted mud system to Middle East

As the most peofeedinal manufacturer for compact mud system, GN Solids Control exported a complete trailer mounted mud system to Middle East.

It is a 200GPM trailer mounted mud system. Wildly used for 150GPM~200GPM water well drilling, HDD, CBM, CSG, etc..

The 200GPM trailer mounted mud system including below equipment:

1) 1 set GN MINI shale shaker GNZS752

2) 1 set GN MINI mud cleaner GNJ752-4S. It is a MINI shale shaker with 4 desilter cone, 4 inch.

3) 2 agitator and a small mixing unit.

Slurry separation plant for micro tunneling

Microtunneling is one kind of trenchless construction.

It is mainly used in urban area. Drilling mud need to be recycling.

The recirculation slurry system used for microtunneling should be as conpact as possilbe and the footprint of the total system shoud be as smaller as possible.

For microtunneling recirculation slurry system, usually, all separation equipment are conbined together, for fast movement and compact.

image