Shale shaker will be the device that removes drill cuttings from the drilling fluids even though circulating and drilling. There are many unique designs and study into the very best design frequently ongoing considering the fact that solids manage is essential in maintaining down expenses associated with the drilling fluids. The basic design consists of big, flat sheets of wire mesh screens or sieves of numerous mesh sizes that shakes or vibrates the drill cuttings. Usually, in shale shaker, the drilling fluids flows across and off the screens and back into the drilling fluids processing method which can be typically called a mud technique. This separates the drill cuttings, usually named solids, in the drilling fluids so that it can be recirculated back down the properly bore. In oilfield sector, linear motion shale shaker is broadly employed for drilling mud solids handle of oil &gas nicely drilling for rig.
GN standard shale shaker models are components of drilling equipment used in quite a few industries, such as coal cleaning, mining, oil and gas drilling. They are considered to be the first phase of a solids control method on a drilling rig, they are utilised to remove significant solids also known as cuttings in the drilling fluids, more typically called “ mud” due to its similar appearance. Shale shaker is first phase solids handle equipment in drilling fluids processing method, also known as key solids manage equipment in drilling mud system, shale shaker decides performance of the whole solids manage technique. GN COMPANY can design double shakers and triplicate shakers on single skid according to clients’ special requirements and also supply relevant connecting manifold, according to current business situation. GN COMPANY provides both the third generation linear motion shale shaker and the fourth generation balanced elliptical shale shaker.
The Maintenance of GN standard shale shaker models
1. Remove the dust on shell to cool the motor basing when the surface is clean.
2. Inspect once a month if the fix parts of motor base and nuts of end cover loosen. If loosen, stop the machine and tight it.
3. Add the LGHP2 lubrication once with filling gun. The filling is no more than 26g for each shaft. Readd every 2000 hours.
4. Observe the temperature raising of motor (the temperature raising means the running temperature subtract ambient temperature ) once half a month to see if the temperature rise abnormally. If the running temperature of bearing of motor shell exceeds 100℃, consult the GN COMPANY in time.
5. Check if the cable is scored or damaged. Change it if damaged then. Once three months.
6. Ensure the grounding resistance of motor shell is no more than 0 ohms. Once three months.
About gn factory Drilling Waste management is important in solids control,pls visit us.or call +1-713-8780880(USA Time).