Drill cuttings solidification unit for waste management

GN Solids Control is China leading manufacturer on mud solids control and drilling waste management field. As the 1rst API certified solids control company in China, and the first China solids control manufacturer who has warehouse and branch company in Houston, USA, GN can offer you professional solutions on mud treatment for oil and gas drilling.
IN year 2015, GN Solids Control promoted its advance drilling waste management equipment: drilling cuttings solidification unit.
GNGH-15 drill cuttings solidifications unit can dry 15 m3 (max.) cuttings per hour. The oil field drill cuttings solidifications unit is mainly combined of mud mixing tank, cement storage tank, absorber storage tank, the conveyer systems, and electrical control system for the whole system. All items mounted on the tank skid for easy movement. GN offers turnkey solution for customers.
Applications of the drilling cuttings solidifications unit:

1) It can be used to dry the drilling cuttings from solids control system, like from shaker, desander, desilter, mud cleaner, and decanter centrifuge
2) More widely, it is used to dry the drilling cuttings from drilling waste management system. The cuttings from solids control system, after further treated by high G drying shaker, vertical cuttings dryer and decanter centrifuge, it is more suitable for drill cuttings solidification unit to treat.
Other Solids Control equipment offered by GN:
1) Shale shaker: linear motion, it is the first step solids control equipment in drilling rig. Nearly all rigs equipped with shale shaker.
2) Desander, it is the second step solids control equipment
3) Desilter, it is the third step solids control equipment.
4) Mud cleaner: it is the combination of shale shaker, desander and desilter
5) Middle speed and high speed Decanter centrifuge
6) Other solids control equipment: centrifugal pump, centrifuge feed pump, mud agitator, mud gun, poor boy degasser, vacuum degasser,
Other Drilling waste management equipment
1) High speed drilling waste decanter centrifuge and big bowl centrifuge
2) High G force 4-panel drying shaker
3) Vertical cuttings dryer
4) Screw conveyer
5) Drill cuttings solidification unit
6) Thermal Desorption unit

GN 1000gpm mud Recycling System working on CPP HDD jobsite

GN 4sests 1000gpm mud process for CPP, was
beat in April, 2015. The particular mud recovery system is a number of stage
mud separation dirt system with mud desander, mud
desilter & centrifuge. For details equipment construction of the mud
system, could you check more from GN 4sets 1000gpm mud recycling where possible
centrifuge system for CPP news.

Our engineer left for CPP jobsite in Northern part of China to give having
service. And he followed down below procedures:
1) Give listing of tools required during having before he came to typically the
jobsite. Let client put together the tools list first to save lots of time.
2) After applications prepared, our engineer head over to jobsite 1-2 days
prior to starting commissioning. To discuss with CPP workers at jobsite and
prepare plan for everyday. The total having period will last about five days.
3) First moment, to arrange mud tank structure at
jobsite. Find right position for mud fish tank, which have good distance
fromHDD going rig. Make balance with the ground, and then put the soil tank to
the correct placement.
After mud tank finish off, mount the framework using desander & desilter immediately
upside on the mud reservoir; mount thecentrifuge framework instantly upside on
the mud aquarium. This framework is designed for quick assembly and
disassembly. Entire cost will be higher, however operation cost will be cheaper
and much time-saving.
4) 2nd day, to connect the wires from power source to be able to mud system,
try to analyze the desander, desilter, decanter centrifuge,
centrifuge feed pump as well as centrifugal pumps.
5) 3 rd day, to do answer questions/ give solutions for all the difficulties
faced in the commissioning.
6) Fourth day, after every thing makes sure no problem, start to analyze the
mud system using drilling mud.
7) Sixth day & sixth moment, our engineer will stay with jobsite to check
the dirt system during working. Right after make sure everything is functioning
normally, our engineer reveals commissioning service feedback notice to jobsite
supervisor allowing him sign and give reviews for our service.
As China and taiwan leading manufacturer for HARD DISK DRIVE mud recycling
system along with solids control
equipment
along with waste management equipment, GN commit to offer better
items, reliable service and ever before work hard to become the Number 1 solids
control manufacturer from China. If you have any needs, pls contact us- GN
Solids Control freely

Related Posts

The need-to-know base of shale shaker

The facts that needs to consider for choosing shale shaker

The capacity of
treating fluid (GPM)

The type of fluid, the ratio of the mass density, the speed of flow and
temperature
that needs to be treating.
Any fluid contains that might include salt and/or acid of materials (Confirm to use
304# stainless steel or 316L stainless steel)
Size of the solids material that leads choosing screen.
The sums of meshes (API)
Where
to install the shale shaker in
oil field

The first -time set-up of the shale shaker

When first set-up the
shale shaker, it
needs keep put the shaker on
a
leveled surface.
The shock-resist rubber materials need be installed between the box and bracket.
Remove the shipping brace like bolt and lug, because the base and screen box
are connected by springs, so when ship, the above part of the equipment is
secured by the shipping brace.
Remove
all the shipping braces before operate the shale shaker.
The
motor cables connected the
vibration motors on the shale shaker always damaged during severe vibration. Cable covers are provide and need to install with cables when connect control panel and the motors
When stop using the shale shaker, the shale shaker
screen
should always be washed by clean water.  It also needs to use diesel fuel to clean the
screen first, and then water when treating oil-base fluid.

image

The installation of shale shaker screen

Install the wedge
blocks at the two sides at the same time.

Make
sure the wedge blocks are firmly installed before turn on the shale shaker.
Do the test-run after the installation of shaker screen to
ensure installation is done corrected.   If
there is any unusual noise of poor contact, stop immediately and re-check the installation of shaker screen.

Related Posts

two Package Drilling waste management instrumentation prepared delivery for continent market.

As China
leading manufacturer for solids management & drilling waste management instrumentation, we have a tendency to support continent
market lots with latest technology instrumentation, smart quality and
affordable worth. Recently, we’ve got two Package Drilling waste management
instrumentation prepared delivery for continent market.
2 Ea vertical cuttings appliance with high
telescopic skid
After several years’ analysis and development,
GN Vertical cuttings appliance is functioning in several international oil
drilling jobsite. it’s our honor to figure with international oil service
corporations, like Baker Hughes, Shell, CPVEN, ONGC, NIDC etc.
The new project is for our recent client in
continent with over ten sets land drilling rigs. we’ve got endlessly been
supporting them over two years. Last year they purchase three sets vertical
cuttings appliance & vi sets bottle centrifuge, operating for three
land rigs. once they tested the operating performance, they repeat orders for
two sets vertical cuttings appliance & four sets bottle centrifuge.

image

For now, GN has two varieties of model vertical cuttings dryer: GNCD930 and GNCD730. completely different|completely
different} size cuttings appliance can acceptable different jobsite
necessities. particularly for offshore drilling, GNCD730 vertical cuttings
appliance with smaller size can work higher.
4 Ea bottle centrifuge with feed pump
4 Ea bottle centrifuges divide into two sets.
one set embrace one Ea variable speed bottle decanter centrifuge & one Ea fastened speed centrifuge. they’re operating
for two sets land rig solids management service. this type of combination is
comparatively economic selection. The high worth variable speed centrifuge will
modification speed terribly flexible; the lower cost fastened speed centrifuge
takes regarding 2-3 hours to vary belt pulley-block to induce totally different
speed. They work along to try to to heavy spar recovery (variable speed
centrifuge with lower speed) or cut mud weight (variable speed centrifuge with
high speed & high speed fastened speed centrifuge)
12 Ea screw conveyor
Screw conveyor is employed to transfer wet and
coarse drilling cuttings discharged from sedimentary rock shaker &
desander & desilter to vertical cuttings appliance. The cuttings
appliance can appliance the cuttings, take away the coarse solids and come back
the clean fluids for reprocess.
10 Ea screw pump
4 Ea screw pump is employed for feeding bottle
centrifuge, two Ea screw pump is employed for flushing the vertical cuttings
appliance, the opposite four sets screw pump is employed for transferring back
the clean lubricating substance from vertical cuttings appliance.
For customers committed in solids management
service, drilling waste management service, mud service, drilling service, or
alternative connected oil service corporations, pls contact United States
freely for any necessities. GN Solids management are your most suitable option
on solids management & drilling waste management answer supplier.

Related Posts

GN 750hp rig mud system for sale

GN Solids
Control is China leading manufacturer for solids control mud system. Recently,
we have one set 750hp rig mud system for sale. The mud system is deigned for
Libya clients last year. But the project hold on because of some cash issues.
The clients who in need of 750hp rig mud system can send email to us, and this
mud system is on sale now with much better price.

Dual mud tank
system, mud tank
dimension: 13500 X 2800 X 2150. The total capacity can reach 70m3, about 400bbl
mud system. The two mud tank, one is mud
recycling tank
; the other one is mud storage tank. The mainly mud system
configuration including:

1) one poor boy
degasser to treat the gas invade mud. When the drilling mud result gas invade,
the proportion of its weight and viscosity have a greater deviation not to meet
the requirements of drilling. The serious situation is that would cause Chung
well, and even blowout accident occurred, if not to treat it timely.

2) one shale
shaker
, GNZS594 with 4 panel shaker screen, working as 1st stage mud
treatment equipment. The 4 panel shaker deck is longer than 3 panel shaker
deck, performance is better.

3) one vacuum
degaser, GNZCQ270, special-purpose device and a new type one for the treatment
of gas in the drilling fluids. It can get rid of various gas of invasive
drilling quickly. Vacuum degasser is very important for returning mud gravity,
stabilizing mud viscosity and reducing drilling cost.

4) One desander ( simple
type): GNWS-2S, with 2ea 10’’ desander cones can have 1000gpm treating capacity
to remove the solids around 40-70microns.

5) One desilter (simple type):
GNWS-12N, with 12ea 4’’ desilter cones can have 1000gpm treating capacity to
remove fine solids around 25-40 microns.

Above is mainly
solids remove equipment, some auxiliary equipment also included, like
centrifuge pump for feeding & transferring; mud agitator for mixing &
suspending,
mud agitator
, mud hoppers etc.

If you have some
requirements, pls contact us freely to get accurate quotation for 750hp rig mud
system.

Related Posts